CONSTRUCTION OF TOILETS
Fidelity Gold Refinery wants 2 toilets built at its Msasa works — building materials supplied and delivered, construction and all installations — within 7 days. Bids close 10 September 2026 at 10:00 CAT.
Construction of two toilets at Fidelity Gold Refinery, No. 1 George Drive, Msasa, Harare. The notice covers supply and delivery of the building materials, the construction itself, and all installations — so this is a design-and-build package rather than a materials order. The programme is 7 days, funded from internally generated funds, with quotations valid for 30 days. The full tender document was not available to us, and no drawings, dimensions or specifications are published. Download the RFQ from the source before quoting; a lump sum on a build with no schedule carries the risk.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 10 Sept 2026, 09:31.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.