HYDROGEN GAS(PURITY 99.9% DEW POINT <-35
Zimbabwe Power Company wants 100 units of hydrogen gas at 99.9% purity with a dew point below -35, delivered to Hwange Power Station within 30 days. Bids close 10 September 2026 at 15:00 CAT.
Industrial hydrogen for Hwange Power Station, specified at 99.9% purity with a dew point below -35. That specification points at generator cooling rather than general industrial use, which is why the dryness matters as much as the purity. The quantity is 100, with the unit recorded only as "Each". For a gas that almost certainly means cylinders, but it could mean cubic metres or cylinder packs, and 100 cylinders of hydrogen is a substantial delivery. Confirm the unit and the cylinder size before pricing. Also unstated: whether ZPC supplies the cylinders or expects them on loan or exchange, which is a normal part of an industrial gas contract and changes the price materially. Delivery is to Hwange within 30 days. Hydrogen is a dangerous good, so transport to Matabeleland North needs the right vehicle and documentation. The full tender document was not available where we read this, so download it from the source before quoting.
Moderate effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 10 Sept 2026, 13:50.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.