SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISIONING AND TRAINING OF A COMPLETE 6000 BOTTLES PER HOUR (BPH) BOTTLED DRINKING WATER PROSUCTION PLANT
ZINWA wants a complete 6000 bottle-per-hour bottled water plant supplied, installed, tested, commissioned and staff trained in Mutare with a bid security of 5,000. Bids close 28 August 2026 at 10:00 CAT.
A complete bottled drinking water production plant at 6000 bottles per hour for the Zimbabwe National Water Authority in Mutare — supplied, delivered, installed, tested, commissioned, with training included. The ten lines set out the plant sections: water treatment plant, PET bottle blow moulding, water filling system, labelling and coding, shrink wrapping and packaging, automation and control system, quality control, utilities and infrastructure, spares and consumables, and contingencies. The delivery period is one year with 90-day bid validity. The full tender document was not available to us — only the notice fields above were published where we can read them. Download it from the eGP portal before quoting.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 28 Aug 2026, 09:28.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.