SUPPLY, INSTALLATION AND SERVICING OF HYDROGEN POWER SUPPLIES AT HWANGE POWER STATION
Zimbabwe Power Company wants hydrogen power supplies at Hwange — 27 TDI H-Series retrofit kits in three part numbers, plus a dew point hydrometer — supplied, installed and serviced within 90 days. Bids close 30 September 2026 at 17:00 CAT.
Supply, installation and servicing of hydrogen power supplies at Hwange Power Station: 9 each of TDI Retrofit H-Series Power Supply kits A, B and C, plus one dew point hydrometer. The part numbers are given as KT-0400-0160, KT-0400-0161 and KT-0400-0160 — the third repeats the first, so two of the three kits carry the same number. This is generator hydrogen cooling plant, so the work sits inside a live station. The delivery period is 90 days with 90-day bid validity. The full tender document was not available to us — only the notice fields above were published where we can read them. Download it from the eGP portal before quoting.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 30 Sept 2026, 16:03.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.