SUPPLY AND DELIVERY OF STAGE 1 AND STAGE 2 TRANSFORMER INSULATING OIL AT KARIBA SOUTH POWER STATION
Zimbabwe Power Company wants 50 000 litres of transformer insulating oil for Kariba South — 30 000 litres of Nynas Nitro Gemini X and 20 000 of Shell Diala S4 ZX. Bids close 16 October 2026 at 17:00 CAT.
Zimbabwe Power Company is buying transformer insulating oil for Kariba South Power Station, in two named grades. The first line is 30 000 litres of Nynas Nitro Gemini X. The second is 20 000 litres of Shell Diala S4 ZX — 50 000 litres in total. Both lines name a specific manufacturer and product, and transformer oil is a certified product where the grade matters to the equipment it goes into, so substitution is unlikely to be acceptable. The title refers to stage 1 and stage 2, which suggests the delivery is phased, though the notice does not set out a schedule. Delivery is to Kariba South Power Station within 90 days, with bids valid for 60 days, funded from internally generated funds. The full tender document was not available to us — only the fields published on the eGP listing. A bidder should download the document from the source before quoting.
Moderate effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 14 Oct 2026, 14:35.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.