SUPPLY AND INSTALLATION OF 1 X 10M3 ABOVE GROUND TANK,INSTALLATION OF PUMP,CONSTRUCTION OF HARDSTANDING FORECOURT,OIL SEPARATOR AND PUMP SHADE
Fidelity Gold Refinery wants a 10 000-litre above ground fuel tank supplied and installed at Mberengwa with a pump, hardstanding forecourt, oil separator, pump shade, calibration and dipsticks. Bids close 7 October 2026 at 10:00 CAT.
A complete small fuel installation at Mberengwa, combining plant and civil works in one package. The supply side is a 10 000-litre (10m³) above ground tank, with calibration and dipsticks. The installation side covers fitting the pump, constructing a hardstanding forecourt, an oil separator and a pump shade. That mix is the thing to note: it needs a contractor who can do civil construction as well as fuel plant, and the notice does not say whether they may be split. What is not published is what any of it is sized against. No fuel type is named, no forecourt dimensions or slab specification, no oil separator capacity, no pump type or flow rate, no ground conditions, and no calibration authority. The period is 10 days, which is short for concrete works. The full tender document was not published where we can read it, so download it from the source and expect a site visit before pricing.
High effort to bid.
Written from the published notice — the full tender document was not available to us. Download it from the source before bidding: eligibility rules, fees and specifications may only appear there.
Read the official notice — GIST links to tenders at their publisher and never mirrors the documents.
Add the deadline to your calendar
Last checked against the publisher on 5 Oct 2026, 10:21.
The board is read from the publisher twice every working day. A tender plan tells you about a tender like this within minutes of publication, and reminds you before it closes.